日韩av在线免费观看完整版,久久厕所国产精品嘘嘘,91精品一区二区,国产一区久爱麻豆

Welcome to Guangxi Xinjingcai Environmental Protection Technology Co., Ltd.
Home > English > News > New

Industrial floor engineering requirements for cement base surfaces and more common problems


       When dealing with industrial floors, there are some places that must be paid attention to. If you do not pay attention, the floor may need to be refurbished.

環氧樹脂薄涂地板.jpg

  An overall requirement for a concrete base:


The new concrete floor before the construction of the epoxy floor needs to be cured for at least 28 days, the moisture content is lower than 6%, and the temperature of the ground is more than 5 degrees; the surface must be free of dust, wax and old paint, oil, grease and loose. Granules and floats, if necessary, must be removed; surface cracks and other defects must be repaired; all concrete bases must be sandblasted or sanded prior to primer application to provide A clean, hard surface with a certain roughness.

[return]   
主站蜘蛛池模板: 基隆市| 泗阳县| 赞皇县| 太湖县| 屯留县| 栖霞市| 开阳县| 余江县| 盐边县| 祁门县| 阆中市| 伊通| 灵寿县| 昌图县| 贞丰县| 武邑县| 饶阳县| 静安区| 柳河县| 江川县| 镇宁| 郓城县| 资兴市| 瓮安县| 雅安市| 马关县| 仪陇县| 都昌县| 仪征市| 尚志市| 丰县| 镇宁| 岗巴县| 普宁市| 汝阳县| 五常市| 阿瓦提县| 原平市| 彩票| 马尔康县| 莱阳市|